LOCATION:   Bangkok, Thailand

 

CLIENT:       MRTA/AEC

 

PERIOD OF SERVICES:   Sep 2015 – Oct 2018

 

CONTRACT COST:  0.000 Baht

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

The MRT Green Line (North) Project, Mo Chit – Saphan Mai Section (C1) has a total length of approximate 11.4 km and 12 stations. The route is elevated, continuing from the existing Bangkok Metropolitan Administration (BMA)/BTS alignment at Mo Chit Station running along Phaholyothin Road, crossing Don Maung Elevated Tollway at Lad Phrao Junction passing Ratchayothin Junction and Kasetsart University, running to Lak Si Junction, running straight to Ying Charoen Market at Saphan Mai.

 

 

SCOPE OF SERVICES:

  • Foundation analysis and design of deep pile

 

 

 

 

KEY FACTORS:

  • Geotechnical design of deep pile foundation