Construction Supervision
LOCATION: Nakhon Prathom, Thailand CLIENT: Department of Rural Road
PERIOD OF SERVICES : Apr 2017 – Apr 2019
CONSTRUCTION SUPERVISION FEE: - Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: The Deportment of Rural Roads has a plan to construct interchange across railway for serving a rail transport in congestion and high accident rate between car and train area. This project located at Nor Thor.1023 road, Tor Lor.4 intersection, Baan Wat Lamud, Nakhonchaisri subdistric, Nakhon Prathom province. |
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION: Nonthaburi, Thailand CLIENT: Department of Rural Road
PERIOD OF SERVICES: Nov 2017 – …….
CONSTRUCTION SUPERVISION FEE: 6,573,738.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: Construction supervise of Nor Bor. 1009 Road, Tor Lor 9- Baan Nong Pai Khad (Section 3) Intersection. Bang Yai, Bang Bua Thong, Nonthaburi Province, 3.638 kilometers length. |
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION: Nakhon Ratchasima, Thailand CLIENT: Department of Rural Road
PERIOD OF SERVICES: Dec 2017 – …….
CONSTRUCTION SUPERVISION FEE: 2,971,225.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: Construction supervision services of road construction at Nor Mor. 1120 Yaek Tor Lor. 2 – Baan Kok Pai, Nakhon Ratchasima province. Total 4 kilometers in length and widening to 4-lane carriageways (along the left and right sides of the irrigation canal) 3.50 meters wide. And construct of footpath, drainage system, electrical system and 5 points of the U-turn across of irrigation canal, and 780 days of construction period.
|
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION: Samutsakorn, Thailand CLIENT: Department of Rural Road
PERIOD OF SERVICES: Jun 2016 – May 2018
CONSTRUCTION SUPERVISION FEE: 0.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: The project is consists construction supervision services of the construction overpass at railway crossing Sor Kor. 2032 Yaek Tor Lor 35, Samutsaporn province. This crossing consist of 345 meters total length segmental box girder overpass and 2 kilometers of service road. |
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION: Nakhonprathom, Thailand CLIENT: Department of Rural Road
PERIOD OF SERVICES: Jun 2016 – May 2018
CONSTRUCTION SUPERVISION FEE: 0.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: The project is consists construction supervision services of the construction overpass railway crossing Nor Thor. 1012 Yaek Tor Lor 4, Bann Klang, Nakornchaisri sub district, Nakornprathom province. This crossing consists of 265 meters total span length I-Girder overpass and 1.5 kilometers of service road. |
SCOPE OF SERVICES:
KEY FACTORS:
|