Instrumentation
LOCATION: Bangkok, Thailand
CLIENT: Thai Obayashi Corporation Ltd.
PERIOD OF SERVICES: Geotechnical Instrumentation:Jun 2013 – Feb 2014
CAPITAL COST: 680,000.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: The SET New Office Project is located on Ratchadaphisek Road in Bangkok. Construction of Foundation and Basement in the project will involve with an excavation work. Therefore, one preventive measure to avoid such damage was set up. Geotechnical instrumentation, inclinometer system is therefore planned and specified.
|
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION: Bangkok, Thailand
CLIENT: Thai Obayashi Corporation Ltd.
PERIOD OF SERVICES: Geotechnical Instrumentation:Jun 2010 – Jun 2013
CAPITAL COST: 680,000.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: Installation and monitoring instrumentation and CCTV system at Depot and 3 Park and Ride Buildings in MRT Purple Line Project to monitor construction performance and the effects of the construction that may induce harm to public.
|
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION : 1. Highway No. 345, Sect. Bangboutong to highway No.307 (Sta.3+408) 2. Express way No. 35, Sect. BKK-Parktor No.307 (Sta.39+327) 3. Highway No. 3268, Sect. Bangpree- Bangbou No.307 (Sta.17+520) 4. Express way No. 7, Suvannabhumi airport- Chonburi Section 3, (Sta.48+007)
CLIENT : Department of Highway ,Thailand (DOH)
PERIOD OF SERVICES: Nov. 2006 – Oct. 2007
CONTRACT COST : 3,700,000.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: The Deferential settlement is often occurred between road embankment in soft ground and bridge structure. The bearing unit structure was selected and design to prevent this problem. Department of Highway (DOH) intends to improve the design assumptions and design methodology for the bearing unit. The monitoring data is used to assess the design methodology during construction and long term performance. The results of the monitoring will be justified how the further remedial work can prolong the longevity or provide the early warning of impending and/or critical failure. International Engineering Consultants Co., Ltd. (IEC) awarded contract to carried out the geotechnical instrumentation work to monitored the behavior of the bearing unit in term of ground movement, pore water pressure, total pressure and also surface settlement. Interpretation and analysis using geotechnical finite element program were carried out.
|
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION : Highway No. 1263 Phangaung-Maehongsorn Thailand
CLIENT : Department of Highway ,Thailand (DOH)
PERIOD OF SERVICES: Aug 2006 – Oct 2006
CONTRACT COST : 1,270,200.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: The slope failure in Northern Thailand is often occurred particularly in Maehongsorn province. Department of Highway (DOH) intends to improve the remedial slope failure methodology. The monitoring data is used to assess the remedial methodology during construction and long term performance. The results of the monitoring will be justified how the further remedial work can prolong the longevity or provide the early warning of impending and/or critical failure. International Engineering Consultants Co.,Ltd (IEC) awarded contract to carried out the geotechnical instrumentation work to monitored the remedial slope performance in term of ground movement, pore water pressure and also surface settlement. Interpretation and analysis using geotechnical finite element program were carried out.
|
SCOPE OF SERVICES:
KEY FACTORS:
|
LOCATION : Sathorn Bangkok, Thailand
CLIENT : KKT Engineering Co., Ltd.
PERIOD OF SERVICES: Geotechnical Instrumentation: Aug 2006 – present
CAPITAL COST : 600,000.00 Baht
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: Construction of the 65 storey condominium, The Met project is located at Sathorn road. According to massive foundation of condominium, foundation behavior in term of stress distribution is one of the major issues for short term and long term behavior. Therefore, installation of strain gauge in bored pile shall be carried out to monitored the stress distribution throughout foundation. |
SCOPE OF SERVICES:
KEY FACTORS:
|