MRT ORANGE LINE (EAST SECTION) PROJECT
LOCATION: Bangkok, Thailand
CLIENT: MRTA
PERIOD OF SERVICES: May 2017 – Dec 2019
CONTRACT COST: 13,000,000 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: The Mass Rapid Transit Authority (MRTA) is implementing the MRT Orange Line (East) Project. The Orange Line (East0 will connect the existing Blue Line Thailand Cultural Centre station to Suwinthawong district in east Bangkok.
Contract E3 involves the design and construction of approximately 4 km long twin bore tunnels from Lam Sali intersection to Khlong Ban Ma with three underground stations, three ventilation shafts and a cut and cover tunnels as a transition structure to connect our underground section to the elevated section of Contract E4.
The MRTA has awarded Contract E3 to Italian-Thai Development PCL (ITD) and, ITD has engaged Ove Arup and Partners International Limited (Arup) as the Designer for Contract E3. Arup has engaged International Engineering Consultants Co., Ltd. (IEC) as the Sub-Designer to design Khlong Bridge Underpinning.
|
SCOPE OF SERVICES:
KEY FACTORS:
|