Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 11833
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 10690
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 5114
ROM KLAO WIND FARM PROJECT 5502
MRT ORANGE LINE (EAST SECTION) PROJECT 4563
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 10527
MITTRAPHAP WIND FARM PROJECT 3994
LOM LIGOR WIND FARM PROJECT 4386
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 10827
KHLONG TRON HYDROPOWER PLANT PROJECT 4165
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 3915
FS-CHUMPORN – RANONG RAILWAY PROJECT 11473
FS BROWN LINE PROJECT 3712
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 12137
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 4246
FLOOD PROTECTION SYSTEM PROJECT 4502
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 4127
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 4581
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 4181
NAKHON SAWAN BYPASS 6633
Trang Project 4052
Engineering Detailed Design of bridge in community area (Group 4) 4052
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 3953
Condition Survey of Structural Components for Don Muang Tollway Project 4067
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 5454
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 3970
Kratoomban Project 4383
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 4189
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 13368
NAKORNRATCHASRIMA INTERCHANGE 4024
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 4203
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 4018
MRT DEPOT OF BLUELINE EXTENSION 5048
NAKHON RATCHASIMA UNDERPASS 4722
GRAND CRYSTAL AND THE CRYSTAL PROJECT 4072
CHAENGWATTANA $ SRISAMAN UNDERPASS 4067
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 3942
CUEL YARD DEVELOPMENT PHASE 4 4493
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 11920