|
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION
|
11833 |
|
FS-CHUMPORN – RANONG RAILWAY PROJECT (2)
|
10690 |
|
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK
|
5114 |
|
ROM KLAO WIND FARM PROJECT
|
5502 |
|
MRT ORANGE LINE (EAST SECTION) PROJECT
|
4563 |
|
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION
|
10527 |
|
MITTRAPHAP WIND FARM PROJECT
|
3994 |
|
LOM LIGOR WIND FARM PROJECT
|
4386 |
|
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT
|
10827 |
|
KHLONG TRON HYDROPOWER PLANT PROJECT
|
4165 |
|
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS))
|
3915 |
|
FS-CHUMPORN – RANONG RAILWAY PROJECT
|
11473 |
|
FS BROWN LINE PROJECT
|
3712 |
|
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT)
|
12137 |
|
CONSTRUCTION SUPERVISION OF DUST FREE ROAD
|
4246 |
|
FLOOD PROTECTION SYSTEM PROJECT
|
4502 |
|
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II)
|
4127 |
|
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I)
|
4581 |
|
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO)
|
4181 |
|
NAKHON SAWAN BYPASS
|
6633 |
|
Trang Project
|
4052 |
|
Engineering Detailed Design of bridge in community area (Group 4)
|
4052 |
|
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway
|
3953 |
|
Condition Survey of Structural Components for Don Muang Tollway Project
|
4067 |
|
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway.
|
5454 |
|
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway
|
3970 |
|
Kratoomban Project
|
4383 |
|
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT
|
4189 |
|
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS
|
13368 |
|
NAKORNRATCHASRIMA INTERCHANGE
|
4024 |
|
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT
|
4203 |
|
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand
|
4018 |
|
MRT DEPOT OF BLUELINE EXTENSION
|
5048 |
|
NAKHON RATCHASIMA UNDERPASS
|
4722 |
|
GRAND CRYSTAL AND THE CRYSTAL PROJECT
|
4072 |
|
CHAENGWATTANA $ SRISAMAN UNDERPASS
|
4067 |
|
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF)
|
3942 |
|
CUEL YARD DEVELOPMENT PHASE 4
|
4493 |
|
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1
|
11920 |