Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 985
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 965
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 555
ROM KLAO WIND FARM PROJECT 800
MRT ORANGE LINE (EAST SECTION) PROJECT 520
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 928
MITTRAPHAP WIND FARM PROJECT 436
LOM LIGOR WIND FARM PROJECT 634
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 947
KHLONG TRON HYDROPOWER PLANT PROJECT 556
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 483
FS-CHUMPORN – RANONG RAILWAY PROJECT 1070
FS BROWN LINE PROJECT 481
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 1066
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 1115
FLOOD PROTECTION SYSTEM PROJECT 1147
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 1045
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 1384
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 1078
NAKHON SAWAN BYPASS 1342
Trang Project 1106
Engineering Detailed Design of bridge in community area (Group 4) 1126
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 1068
Condition Survey of Structural Components for Don Muang Tollway Project 1115
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 1065
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 1065
Kratoomban Project 1150
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 1079
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 3023
NAKORNRATCHASRIMA INTERCHANGE 1118
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 1090
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 1105
MRT DEPOT OF BLUELINE EXTENSION 1402
NAKHON RATCHASIMA UNDERPASS 1463
GRAND CRYSTAL AND THE CRYSTAL PROJECT 1124
CHAENGWATTANA $ SRISAMAN UNDERPASS 1117
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 1088
CUEL YARD DEVELOPMENT PHASE 4 1277
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 2620