TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION
|
10616 |
FS-CHUMPORN – RANONG RAILWAY PROJECT (2)
|
9549 |
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK
|
4580 |
ROM KLAO WIND FARM PROJECT
|
4993 |
MRT ORANGE LINE (EAST SECTION) PROJECT
|
3998 |
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION
|
9389 |
MITTRAPHAP WIND FARM PROJECT
|
3500 |
LOM LIGOR WIND FARM PROJECT
|
3916 |
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT
|
9722 |
KHLONG TRON HYDROPOWER PLANT PROJECT
|
3718 |
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS))
|
3408 |
FS-CHUMPORN – RANONG RAILWAY PROJECT
|
10232 |
FS BROWN LINE PROJECT
|
3257 |
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT)
|
10883 |
CONSTRUCTION SUPERVISION OF DUST FREE ROAD
|
3842 |
FLOOD PROTECTION SYSTEM PROJECT
|
4002 |
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II)
|
3739 |
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I)
|
4171 |
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO)
|
3784 |
NAKHON SAWAN BYPASS
|
6080 |
Trang Project
|
3669 |
Engineering Detailed Design of bridge in community area (Group 4)
|
3651 |
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway
|
3560 |
Condition Survey of Structural Components for Don Muang Tollway Project
|
3645 |
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway.
|
4998 |
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway
|
3532 |
Kratoomban Project
|
3968 |
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT
|
3789 |
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS
|
12193 |
NAKORNRATCHASRIMA INTERCHANGE
|
3646 |
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT
|
3754 |
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand
|
3617 |
MRT DEPOT OF BLUELINE EXTENSION
|
4477 |
NAKHON RATCHASIMA UNDERPASS
|
4262 |
GRAND CRYSTAL AND THE CRYSTAL PROJECT
|
3645 |
CHAENGWATTANA $ SRISAMAN UNDERPASS
|
3656 |
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF)
|
3570 |
CUEL YARD DEVELOPMENT PHASE 4
|
4055 |
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1
|
10830 |