Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 11658
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 10523
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 5066
ROM KLAO WIND FARM PROJECT 5469
MRT ORANGE LINE (EAST SECTION) PROJECT 4521
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 10354
MITTRAPHAP WIND FARM PROJECT 3957
LOM LIGOR WIND FARM PROJECT 4350
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 10668
KHLONG TRON HYDROPOWER PLANT PROJECT 4137
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 3873
FS-CHUMPORN – RANONG RAILWAY PROJECT 11300
FS BROWN LINE PROJECT 3681
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 11963
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 4219
FLOOD PROTECTION SYSTEM PROJECT 4472
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 4088
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 4540
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 4151
NAKHON SAWAN BYPASS 6576
Trang Project 4020
Engineering Detailed Design of bridge in community area (Group 4) 4020
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 3924
Condition Survey of Structural Components for Don Muang Tollway Project 4035
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 5417
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 3938
Kratoomban Project 4357
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 4151
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 13195
NAKORNRATCHASRIMA INTERCHANGE 4000
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 4171
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 3977
MRT DEPOT OF BLUELINE EXTENSION 5000
NAKHON RATCHASIMA UNDERPASS 4694
GRAND CRYSTAL AND THE CRYSTAL PROJECT 4040
CHAENGWATTANA $ SRISAMAN UNDERPASS 4036
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 3914
CUEL YARD DEVELOPMENT PHASE 4 4462
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 11755