Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 2007
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 1864
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 1020
ROM KLAO WIND FARM PROJECT 1402
MRT ORANGE LINE (EAST SECTION) PROJECT 882
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 1833
MITTRAPHAP WIND FARM PROJECT 739
LOM LIGOR WIND FARM PROJECT 979
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 1839
KHLONG TRON HYDROPOWER PLANT PROJECT 920
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 776
FS-CHUMPORN – RANONG RAILWAY PROJECT 2078
FS BROWN LINE PROJECT 751
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 2131
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 1391
FLOOD PROTECTION SYSTEM PROJECT 1463
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 1314
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 1761
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 1373
NAKHON SAWAN BYPASS 1666
Trang Project 1376
Engineering Detailed Design of bridge in community area (Group 4) 1390
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 1315
Condition Survey of Structural Components for Don Muang Tollway Project 1382
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 1332
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 1308
Kratoomban Project 1430
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 1357
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 4017
NAKORNRATCHASRIMA INTERCHANGE 1372
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 1362
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 1397
MRT DEPOT OF BLUELINE EXTENSION 1745
NAKHON RATCHASIMA UNDERPASS 1826
GRAND CRYSTAL AND THE CRYSTAL PROJECT 1380
CHAENGWATTANA $ SRISAMAN UNDERPASS 1359
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 1329
CUEL YARD DEVELOPMENT PHASE 4 1564
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 3535