Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 4334
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 3790
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 2091
ROM KLAO WIND FARM PROJECT 2361
MRT ORANGE LINE (EAST SECTION) PROJECT 1695
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 3740
MITTRAPHAP WIND FARM PROJECT 1484
LOM LIGOR WIND FARM PROJECT 1830
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 3692
KHLONG TRON HYDROPOWER PLANT PROJECT 1769
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 1544
FS-CHUMPORN – RANONG RAILWAY PROJECT 4226
FS BROWN LINE PROJECT 1453
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 4330
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 2053
FLOOD PROTECTION SYSTEM PROJECT 2158
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 1981
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 2406
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 2052
NAKHON SAWAN BYPASS 2526
Trang Project 2024
Engineering Detailed Design of bridge in community area (Group 4) 2005
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 1928
Condition Survey of Structural Components for Don Muang Tollway Project 2003
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 1992
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 1933
Kratoomban Project 2121
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 2064
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 6249
NAKORNRATCHASRIMA INTERCHANGE 2002
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 2050
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 2050
MRT DEPOT OF BLUELINE EXTENSION 2585
NAKHON RATCHASIMA UNDERPASS 2496
GRAND CRYSTAL AND THE CRYSTAL PROJECT 2015
CHAENGWATTANA $ SRISAMAN UNDERPASS 1989
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 1955
CUEL YARD DEVELOPMENT PHASE 4 2295
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 5428