Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 3803
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 3359
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 1835
ROM KLAO WIND FARM PROJECT 2155
MRT ORANGE LINE (EAST SECTION) PROJECT 1501
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 3312
MITTRAPHAP WIND FARM PROJECT 1293
LOM LIGOR WIND FARM PROJECT 1634
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 3258
KHLONG TRON HYDROPOWER PLANT PROJECT 1577
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 1380
FS-CHUMPORN – RANONG RAILWAY PROJECT 3734
FS BROWN LINE PROJECT 1291
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 3827
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 1875
FLOOD PROTECTION SYSTEM PROJECT 1987
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 1812
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 2241
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 1875
NAKHON SAWAN BYPASS 2306
Trang Project 1856
Engineering Detailed Design of bridge in community area (Group 4) 1843
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 1769
Condition Survey of Structural Components for Don Muang Tollway Project 1839
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 1800
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 1767
Kratoomban Project 1945
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 1885
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 5766
NAKORNRATCHASRIMA INTERCHANGE 1846
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 1878
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 1876
MRT DEPOT OF BLUELINE EXTENSION 2366
NAKHON RATCHASIMA UNDERPASS 2316
GRAND CRYSTAL AND THE CRYSTAL PROJECT 1841
CHAENGWATTANA $ SRISAMAN UNDERPASS 1827
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 1772
CUEL YARD DEVELOPMENT PHASE 4 2108
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 4999