TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION

 

LOCATION:   Saraburi – Nakhon Ratchasima Thailand

 

CLIENT:       ITD-RT Joint Venture

 

PERIOD OF SERVICES:   Jan 2017 – Jun 2017

 

CONTRACT COST:  1,250,000 Baht

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

ITD-RT Joint Venture is seeking to bid for the State Railways of Thailand (SRT) Construction of Track Doubling Project for Northeastern Line Map Kabao – Thanin Chira Junction.

 

ITD-RT Joint Venture appointed International Engineering Consultants (IEC) and Amberg Engineering (Amberg) to provide design services for Part II Design and Build Works Item 7 Tunneling Works.

 

The construction of Track Doubling Project for Northeastern Line Map Kabao – Thanin Chira Junction comprises the construction of three tunnels. The tunnels are located in the central and the north-eastern part of Thailand.

 

SCOPE OF SERVICES:

The Part II Design and Built Works Item 7 Tunneling Works broadly comprises:

  • Portal slopes excavation and initial tunnel drive excavation
  • Main tunnels excavation and support
  • Cross passages excavation and support
  • Special works associated with tunneling e.g. consolidation grouting etc.
  • Cut and cover excavation
  • Mechanical and Electrical works associated with tunnel operation (not future traction provisions)
  • Ventilation works

 

KEY FACTORS:

  • Geotechnical and structural design of tunnel, portal slope excavation, main tunneling excavation and support, cross passage excavation and support, and ventilation works.