TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION
LOCATION: Saraburi – Nakhon Ratchasima Thailand
CLIENT: ITD-RT Joint Venture
PERIOD OF SERVICES: Jan 2017 – Jun 2017
CONTRACT COST: 1,250,000 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: ITD-RT Joint Venture is seeking to bid for the State Railways of Thailand (SRT) Construction of Track Doubling Project for Northeastern Line Map Kabao – Thanin Chira Junction.
ITD-RT Joint Venture appointed International Engineering Consultants (IEC) and Amberg Engineering (Amberg) to provide design services for Part II Design and Build Works Item 7 Tunneling Works.
The construction of Track Doubling Project for Northeastern Line Map Kabao – Thanin Chira Junction comprises the construction of three tunnels. The tunnels are located in the central and the north-eastern part of Thailand.
|
SCOPE OF SERVICES: The Part II Design and Built Works Item 7 Tunneling Works broadly comprises:
KEY FACTORS:
|