FS-CHUMPORN – RANONG RAILWAY PROJECT (2)

 

LOCATION:   Bangkok, Thailand

 

CLIENT:       Italian-Thai Development Public Company Limited (ITD)

 

PERIOD OF SERVICES:   Apr 2017 – Jul 2017

 

CONTRACT COST:  2,000,000 Baht

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

The MRT Green Line (North) Project requires to construct the flyover bridge over Sena Junction in order to minimize traffic congestion at the junction in the future.

 

SCOPE OF SERVICES:

  • Conceptual and preliminary design of the flyover bridge
  • Detailed design the flyover bridge including drawings and calculation report
  • Shop drawings of the flyover bridge

 

KEY FACTORS:

  • Geotechnical design of deep pile foundation
  • Flyover bridge design