Condition Survey of Structural Components for Don Muang Tollway Project
LOCATION: Don Muang Tollway Project, Thailand CLIENT: Don Muang Tollway Public Co., Ltd. PERIOD OF SERVICES : March 2009– July 2009 CONSTRUCTION COST: 6.6 MB FINANCED BY: - ASSOCIATED FIRMS: Thai MM DESCRIPTION OF PROJECT: Don Muang Tollway Public Co., Ltd. (DMT) requires a consulting firm to study and evaluate structural integrity of bridge components of the elevated Utrabhimuk Tollway (20 km in distance, approx. ) and to prepare database and guidelines for DMT to perform periodical maintenance and rehabilitation during the remaining concession period.
|
SCOPE OF SERVICES: · To inspect and evaluate conditions of bridge components of main the elevated Tollway and on-off ramps. · To inspect and evaluate pavement conditions (including pavement damage, roughness, rutting depth, and skid resistance · To perform Bridge load test to evaluate actual bridge behaviors and to predict bridge service life. · To study and develop appropriate methods of repair, rehabilitation and maintenance · Develop bridge condition database, Bridge Maintenance System (BMS) and financial plan for asset management during the remain concession period. |