Title Hits
TRACK DOUBLING PROJECT FOR NORTHEASTERN LINE MAP KABAO – THANON CHIRA JUNCTION 12549
FS-CHUMPORN – RANONG RAILWAY PROJECT (2) 11373
SUVARNABHUMI AIRPORT EXPANSION PROJECT 3rd RUNWAY DESIGN WORK 5305
ROM KLAO WIND FARM PROJECT 5662
MRT ORANGE LINE (EAST SECTION) PROJECT 4765
MRT GREEN LINE (NORTH) PROJECT MO CHIT – SAPHAN MAI SECTION 11225
MITTRAPHAP WIND FARM PROJECT 4153
LOM LIGOR WIND FARM PROJECT 4542
LENDER’S TECHNICAL ADVISOR FOR MRT PINK LINE AND YELLOW LINE PROJECT 11544
KHLONG TRON HYDROPOWER PLANT PROJECT 4290
CIVIL CONSTRUCTION OF BULK POWER (SUBSTATION BUILDING (BSS)) 4073
FS-CHUMPORN – RANONG RAILWAY PROJECT 12189
FS BROWN LINE PROJECT 3847
BANG BAL – BANG SAI (FLOO DIVERSION CHANNEL PROJECT) 12916
CONSTRUCTION SUPERVISION OF DUST FREE ROAD 4385
FLOOD PROTECTION SYSTEM PROJECT 4664
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase II) 4292
Studies and Research on Void Detection Under Concrete Pavement and Subsealing (Phase I) 4746
HIGHWAY ROUTE NO.103 (RONGKWANG-NGAO) 4361
NAKHON SAWAN BYPASS 6866
Trang Project 4204
Engineering Detailed Design of bridge in community area (Group 4) 4205
Bridge Inspection and loading test for Slab type bridge in the 15th area of Department of Highway 4104
Condition Survey of Structural Components for Don Muang Tollway Project 4208
Bridge Inspection and loading test for Slab type bridge in the 3rd, 7th and 8th area of Department of Highway. 5615
Bridge Inspection and loading test for Slab type bridge in the 1st, 4th and 6th area of Department of Highway 4136
Kratoomban Project 4521
THUNGSONG INTERCHANGE (HWY 41 & 403) NAKORNSRITHAMMARAT 4378
BANGKOK MASS TRANSIT SYSTEM (MOCHIT – SAPAN MAI SECTION) RATCHAYOTHIN UNDERPASS 14081
NAKORNRATCHASRIMA INTERCHANGE 4175
RAW WATER TUNNEL FOR KROM KHLONG PRAPA ROAD PROJECT 4366
Studies and Research on Slope Stabilization induced by Erosion and slide for highway in northern Thailand 4175
MRT DEPOT OF BLUELINE EXTENSION 5283
NAKHON RATCHASIMA UNDERPASS 4911
GRAND CRYSTAL AND THE CRYSTAL PROJECT 4222
CHAENGWATTANA $ SRISAMAN UNDERPASS 4214
RETAINING WALL AND GROUND STABILIZATION (PANYA INDRA GOLF) 4070
CUEL YARD DEVELOPMENT PHASE 4 4640
BANGKOK TRANSIT SYSTEM EXTENSION – SUKHUMVIT LINE SECTION 1 12626