LOCATION: Bangkok, Thailand
CLIENT: Thai Obayashi Corporation Ltd.
PERIOD OF SERVICES:
Geotechnical Instrumentation:Jun 2010 – Jun 2013
CAPITAL COST: 680,000.00 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT:
Installation and monitoring instrumentation and CCTV system at Depot and 3 Park and Ride Buildings in MRT Purple Line Project to monitor construction performance and the effects of the construction that may induce harm to public.
|
SCOPE OF SERVICES:
-
Supplied and installed the following instruments:
-
Inclinometer, to monitor magnitude and rate of ground movement in the lateral direction.
-
Piezometer (Vibrating Wire), to monitor pore-water pressure.
-
Observation Well, to monitor ground water level.
-
Magnetic Extensometer, to monitor soil and heave in excavations, foundations, shafts and sheet piles.
-
Shallow Settlement Marker, to monitor surface settlement.
-
Monitoring work and interpretation report
-
Impact assessment due to construction work
KEY FACTORS:
-
The monitoring results are assessed how the construction can proceed without risk of failure and perform proper function in long term period.
-
The monitoring results provide the early warning of impending and/or critical failure,
-
Improve the remedial methodology.
|