DEMCO PUBLIC COMPANY LIMITED (INVESTIGATION WTG 23A)

 

LOCATION:    Huay Bong, Dankhuntod, Nakhonratchasima, Thailand.

 

CLIENT:       DEMCO PUBLIC COMPANY LIMITED

PERIOD OF SERVICES:  April 2018

 

FINANCED BY:           N/A

 

ASSOCIATED FIRMS:    N/A

 

DESCRIPTION OF PROJECT:

KR2-Huay Bong Wind farm Project. After recommissioning and operate the turbine it is that found some cracks of foundation slab in WTG 23A. Therefore IEC would instruct Demco to investigate crack width, number of crack, crack length, crack depth of foundation slab WTG 23A.

 

SCOPE OF SERVICES:

  • Visual inspection is limited to those areas and sections of foundation that is fully accessible and visible to the inspectors (IEC) at the time of inspection.
  • Checks of the crack depth by Ultrasonic Pulse Velocity (UPV) in the concrete components.

 

KEY FACTORS:

 

  • Non-Destructive Testing using Ultrasonic pulse Velocity Method (UPV) to determine crack depth.
  • Foundation visual inspection