CHIENGRAK NOI BRIDGE
LOCATION: Pathumthanee, Thailand
CLIENT: Inter-Consults Co.,Ltd
PERIOD OF SERVICES: May 2006 – August 2006
CAPITAL COST: 8,000,000 Baht
FINANCED BY: N/A
ASSOCIATED FIRMS: N/A
DESCRIPTION OF PROJECT: Due to the accident of fuel transportation truck crashed to 6- lanes Chiengrak Noi concrete bridge. The consequence of fire effect to the structural integrity. The bridge girder and cantilever deck was severe damaged by fire. The destructive and non-destructive test was carried out in term of concrete and steel strength determination using coring, hardness test and tension test respectively. The remedial design and construction of the damage bridge was awarded to Inter-Consults Co., Ltd. on a turn-key basis. One of the most well-known non-destructive methods to evaluate the bridge structural capacity is called “Bridge Diagnostic” by attached the most accuracy strain gauge in the significant bridge element. This non-destructive test has been carried out both of previous and after executed the remedial work to ensure that the damaged bridge is recovered in function.
|
SCOPE OF SERVICES: · Executed non-destructive testing “ Bridge Diagnostic · Analysis the load capacity of damaged bridge and post renovatation · Evaluate the existing bridge condition to ensure the proper remedial design · Recommend the remedial design work
KEY FACTORS: · Evaluate the existing damage bridge condition
|